top of page
tech4 transparent.png

Telecommunications Support and Services

​

Mini-OLT Light ODN (MILO) Installation as FTTH construction wherein a core(s) Fiber Drop Cable shall be used from the Point of Insertion (POI) to the Network Access Points (NAP), instead of the conventional Fiber Optic Cable. A hybrid type splicing closure will be used in POI and that Local Convergence Point (LCP) splitters will be spliced and installed inside the first Nap box, doing away with a LCP Closure.

​

Site survey and Report Installations includes FOC Cable Laying, OLT equipment and mounting, laying of power and grounding cables, link up to FOC to uplink switch.

​

Power /Rectifier System Outdoor Cabinet (includes installation of rectifier sub rack, rectifier modules, batteries, power cable, grounding cable and other accessories and power tapping to main box.

​

Battery Cabinet installation (includes installation of batteries, power tapping to rectifier cabinet and testing of battery banks. Power/Rectifier System Commissioning & Acceptance.

bottom of page